Construction Gallery
Our “Construction Photo Gallery” shows how panels go together and what panels can do. Jobsites are fairly clean and panel setting crews have two to five persons. Panels are numbered in their order of erection and we check everything in our factory for fit before shipping to your jobsite. Starting with a corner panel, the building envelope wraps around the perimeter and returns to the starting point. Sealant is applied at all panel joints to ensure air-tightness and a secondary top plate can be applied after the panels are up.